A run-of-river scheme on the Tamor River, Phungling Municipality, Taplejung, Koshi Province.
| Item | Value |
|---|---|
| Installed capacity | 24 MW (3 × 8 MW) |
| Design discharge | 21.6 m³/s (Q40) |
| Gross head | 132 m |
| Turbine type | Francis, vertical axis |
| Headrace tunnel | 3.4 km, D-shaped, 4.2 m |
| Transmission | 132 kV, 18 km to Dhungesanghu substation |
| PPA | NEA, 30 years, signed 2074 |
| Commercial operation | Baisakh 1, 2079 |
| Project cost | NPR 4.3 billion |